Supply,Erection,Testing & Communicationing
Grid operation device(GOD), HT panel, LT panel(PCC,MCC), APFC panel, Bus duct, PLC panel , VFD panel
Cable laying and Removing, HT/LT cable fault finding, Termination of cable, joint kit for HT/LT, cabel Hi-Pot testing.
Oil filtration, Overhauling maintenance, Shifting - lifting, installation Work, Testing of transfomer, Modification of transformer.
Cable tray installation, any type of bus fabrication work, panel modification, HT/LT panel raising platform, transformer rising.
Supply and installation of earth pit, Supply and lying
Flashed/flooded/old ht panel,flashed/flooded/old LT panel, control panel, lighting distribution, colony quarter wiring.
GOD, HT Panel, VCB, ACB, Transformer, LT Panel, Switchgear, Spares for VCB, Cabel, Cabel Tray, Protection relay, Meters, capacitor, Junction Boxes.
Turnkey job of Synchronizing, Grid Connectivity for REC Purpose.